Pump and compressor skid: inspection and start-up readiness
Prepare a packaged unit for shipment and subsequent commissioning at an industrial site.
- Checked package completeness, equipment tags and document set
- Inspected piping, instrumentation, valves and service access points
- Coordinated packing, dispatch and the pre-start action list
The buyer received an assembled package with a clear inspection record, open points and steps required before start-up.